Estey Avenue Residential Mangrove Removal

Naples, Florida Existing single-family home lot being redeveloped into 6 single-family home subdivision.  Project involved coordination with FDEP to receive a residential mangrove removal alteration permit to remove 9,775 SF of mangroves on Rock Creek in Naples, FL. 0.28 credits were purchased through LPI Mitigation Bank. Project will include up to 6-slip dock and riprap…

Read more

Harbor Heights Boat Ramp Improvements

Punta Gorda, Florida Weiler Engineering Corporation (WEC) provided the design and permitting for the Harbor Heights Boat Ramp Improvements, which included the addition of two (2) piers, as well as replacement of the boat ramp and various improvements for ADA access. WEC worked closely with County staff and the Contractor (Kelly Brothers, Inc) throughout the…

Read more

Boat House Coral Lagoon

Marathon, Florida Weiler Engineering Corporation (WEC) was contracted to revise the existing marina layout and expand the dry boat storage capacity with a rock stormwater retention system incorporated within the building footprint; along with the design and permitting of the wastewater treatment plant, and structural engineering of the 25 villas and accessory buildings. This project also required permitting…

Read more

Palm Island Marina

Cape Haze, Florida Palm Island Marina is an 8 acre site that provides transient and long term dockage facilities, indoor dry storage units, and fueling services. Weiler Engineering Corporation was contracted to permit two additional dry storage buildings  (58,000 SF total) and complete the design of the stormwater management system in 1998. This project area had 0.44…

Read more
Picture of Gasparilla State Park

Gasparilla Island State Park Boardwalk Replacement

The historic Port Boca Grande Lighthouse within Gasparilla Island State Park is the oldest structure on the island, having provided a beacon for mariners’ safe passage through Boca Grande Pass since 1890. Other beach access boardwalks at this State Park have been rendered inaccessible and closed due to extensive erosion of the beach up to…

Read more
Picture of Cayo Costa State Park

Cayo Costa Restroom Replacement

Weiler Engineering Corporation (WEC) inspected and assessed the existing restroom facility, and due to the poor condition and non-compliance with current building codes, provided the structural design (as well as civil design) for a new elevated restroom at the Cayo Costa State Park Campground. This facility services 300+ visitors a day and is the primary…

Read more
Arial Picture of Indigo Reef Resort and Marina

Indigo Reef Resort and Marina

Weiler Engineering Corporation (WEC) provided complete site, structural design, permitting and construction contract administration for Indigo Reef Resort Villas & Marina 67 unit waterfront resort and 67 slip marina on Florida Bay. Engineering design services and services during construction were provided for nearly every phase of this project including site, stormwater drainage and treatment, water…

Read more
The Marker Waterfront Resort

The Marker Waterfront Resort

The Marker Waterfront Resort was constructed on a 1.90 acre site located in down- town Key West just two blocks from Duval Street. Constructed in a typical Key West style, this hotel offers 96 luxury rooms, three pools, spa, meeting space & offices, a fitness center, restaurant, and pool bar, it is the premier choice for…

Read more